The work included an extensive safety plan to be submitted to Chevron for review and approval. This also included a site plan with a step by step process to remove buildings and a traffic control plan. Equipment and containers were mobilized to remove debris and metal. Buildings were removed methodically and materials were sorted – metal hauled to a specified recycling center and dirt, broken concrete and other debris was sent to a specified landfill. All protrusions in existing concrete foundation was removed using a hoe ram attachment and metal was cut using an acetylene torch. A Special Hot Work Permit was needed from Chevron prior to any open flame work performed. The area was inspected and signed off as exceeding expectations for Chevron.

Project Details

  • Submission of Safety Plan, Traffic Plan, Procedures for Building Removals
  • Mobilization and Site Preparation
  • Barriers were installed, demarcations and signage
  • All work and hot work permits were in place prior to project
    commencement
  • Removed building Structures using Excavator, sorted and loaded into 40
    yard roll-off container
  • Removed all concrete protrusions with hoe ram attachment for excavator,
    loaded into 40 yard roll-off container
  • Final Clean-up, removal of demarcations and signage
Company: Scott Constructors Industrial, LLC
Owner: Chevron Corporation Pascagoula MS Facility
Year: 2019
Location: Chevron Corporation Refinery, Pascagoula, MS